Hotel Gymkhana

Location: Aurangabad
Industry: Hotel
Capacity: 200 KW
Estimated Annual Generation: 2.80 Lakhs
Estimated Annual Savings: 22.40 Lakhs

Hotel AGC in Aurangabad, is a Club cum hotel property with 4 star facilities, spread over two and half acres lush green landscape.

Need

Being a commercial hotel industry tariff rate of electricity is very high to reduce the monthly electricity bill Gymkhana hotel went for highest size possible

Challenges

There are multiple headrooms, water tanks, antenna’s, water heaters etc.. to make aa design that would fit into the engineering without affecting the generation was a big challenge

Solution

INFISOL did a lot of revisions and come up with the finest soution that would not affect their existing ecosystem, The solar system has been installed with super elevated structure.